Spesifikasi Produk
| SKU |
|
| Garansi |
- |
| Dimensi |
40cm x 60cm x 20cm |
| Berat |
10,0kg |
| Produk |
Non-UMKM |
| Buatan |
Luar Negri |
| KBKI |
- |
| Sertifikat TKDN |
|
| TKDN |
0.00% |
| BMP |
0.00% |
| TKDN + BMP |
0% |
Deskripsi
Instalasi Panel Listrik — Perubahan Panel 1 Phase ke 3 Phase (60A)
- Box Panel = 40×60×20 cm Indoor, Plat 1,2 mm
- MCCB Incoming = Schneider EasyPact EZC, 3 Phase, 60A
- MCB Outgoing = CHINT NXB, 1 Phase, 16A
- Ampere Meter = Panel Meter Analog, 0-100A
- CT (Current Transformer) = Current Transformer 100/5A
- Volt Meter = Panel Meter Analog, 0-500V
- Selector Switch Volt = 7 Position
- Bus Bar = Netral + Ground + Isolator
- Pilot Lamp = 220 VAC, LED
- ACC & Wiring = Terminal, kabel kontrol, skun, duct, DIN rail, gland, dll.
- Kabel NYY = 4×10 mm² Eterna
- Kabel NYY = 4×6 mm² Eterna
- ATS (Automatic Transfer Switch) = Vision 63A 4P Automatic PLN-Genset
JASA INSTALASI & PEKERJAAN
- Pembongkaran panel/instalasi 1 phase lama (Termasuk pengamanan sementara suplai listrik)
- Perakitan & instalasi panel baru (Assembly komponen panel, wiring internal, pengujian panel)
- Instalasi kabel NYY & terminasi (Penarikan kabel, skun, terminasi ke panel & beban)
- Instalasi ATS & pengujian sistem PLN-Genset (Setting, wiring kontrol, uji fungsi otomatis)
- Testing, commissioning & megger test (Pengujian tahanan isolasi, uji beban, dokumentasi)